| ۲۱ | Scenario-based design of a steel sustainable closed-loop supply chain network considering production technology | Mohammad Pourmehdi, Mohammad Mahdi Paydar, Ebrahim Asadi-Gangraj | JOURNAL OF CLEANER PRODUCTION | 2020 |
| ۲۲ | Dynamic virtual cell formation considering new product development | Ahmad reza Rostami, Mohammad Mahdi Paydar, Ebrahim Asadi-Gangraj | Scientia Iranica | 2020 |
| ۲۳ | A simultaneous worker assignment and scheduling problem to minimize makespan in flexible flow shop via metaheuristic approaches | Fatemeh Bozorgnezhad, Ebrahim Asadi-Gangraj, Mohammad Mahdi Paydar | International Journal of Industrial Engineering and Production Research | 2019 |
| ۲۴ | Metaheuristic algorithms for flexible flow shop scheduling problems with unrelated parallel machines | Ebrahim Asadi-Gangraj | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2019 |
| ۲۵ | Metaheuristic algorithms to allocate and schedule of the rescue units in the natural disaster with fatigue effect | Sina Nayeri, Ebrahim Asadi-Gangraj, Saeed Emami | NEURAL COMPUTING and APPLICATIONS | 2019 |
| ۲۶ | A robust bi-level optimization modelling approach for municipal solid waste management; a real case study of Iran | Sepideh Pouryani, Ebrahim Asadi-Gangraj, Mohammad Mahdi Paydar | JOURNAL OF CLEANER PRODUCTION | 2019 |
| ۲۷ | Designing a mathematical model for dental tourism supply chain | Fatemeh Ahmadi manesh, Mohammad Mahdi Paydar, Ebrahim Asadi-Gangraj | TOURISM MANAGEMENT | 2019 |
| ۲۸ | Lagrangian relaxation approach to minimize makespan for hybrid flow shop scheduling problem with unrelated parallel machines | Ebrahim Asadi-Gangraj | Scientia Iranica | 2018 |
| ۲۹ | Designing a bi-objective multi-echelon robust blood supply chain in a disaster | Mitra Habibi, Mohammad Mahdi Paydar, Ebrahim Asadi-Gangraj | APPLIED MATHEMATICAL MODELLING | 2018 |
| ۳۰ | Goal programming-based post-disaster decision making for allocation and scheduling the rescue units in natural disaster with time-window | Sina Nayeri, Ebrahim Asadi-Gangraj, Saeed Emami | International Journal of Industrial Engineering and Production Research | 2018 |
| ۳۱ | a heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines | Ebrahim Asadi-Gangraj | International Journal of Industrial Engineering and Production Research | 2017 |
| ۳۲ | A Heuristic Approach to Solve Hybrid Flow-Shop Scheduling Problem with Unrelated Parallel Machines | Ebrahim Asadi-Gangraj | International Journal of Industrial Engineering and Production Research | 2017 |
| ۳۳ | انتخاب تأمين كنندگان پايدار در زنجيره تأمين صنايع لبني با استفاده از روش تركيبي ديمتل فازي و ويكور فازي؛ مطالعه موردي | سحر آقابراري كاظمي, ابراهيم اسدي گنگرج, علي ديوسالار | پژوهش هاي مهندسي صنايع در سيستم هاي توليد | 1402 |
| ۳۴ | تخصيص و زمان بندي واحدهاي امداد در بلاياي طبيعي با استفاده از الگوريتم هاي ژنتيك و بهينه سازي ازدحام ذرات | سينا نيري قاديكلايي, ابراهيم اسدي گنگرج, سعيد امامي | مديريت بحران | 1397 |
| ۳۵ | توسعه روش هاي فراابتكاري براي حل مسئله زمانبندي نيروي انساني در محيط جريان كارگاهي | فاطمه بزرگ نژادديوكلائي, ابراهيم اسدي گنگرج, محمد مهدي پايدار | مدلسازي در مهندسي | 1397 |
| ۳۶ | توسعه روش آزادسازي لاگرانژين براي حل مساله زمانبندي در محيط جريان كارگاهي انعطاف پذير | ابراهيم اسدي گنگرج, نسيم نهاوندي | پژوهش هاي مهندسي صنايع در سيستم هاي توليد | 1394 |