| 21 | Dynamic virtual cell formation considering new product development | Ahmad reza Rostami, Mohammad Mahdi Paydar, Ebrahim Asadi-Gangraj | Scientia Iranica | 2020 |
| 22 | A simultaneous worker assignment and scheduling problem to minimize makespan in flexible flow shop via metaheuristic approaches | Fatemeh Bozorgnezhad, Ebrahim Asadi-Gangraj, Mohammad Mahdi Paydar | International Journal of Industrial Engineering and Production Research | 2019 |
| 23 | Metaheuristic algorithms for flexible flow shop scheduling problems with unrelated parallel machines | Ebrahim Asadi-Gangraj | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2019 |
| 24 | Metaheuristic algorithms to allocate and schedule of the rescue units in the natural disaster with fatigue effect | Sina Nayeri, Ebrahim Asadi-Gangraj, Saeed Emami | NEURAL COMPUTING and APPLICATIONS | 2019 |
| 25 | A robust bi-level optimization modelling approach for municipal solid waste management; a real case study of Iran | Sepideh Pouryani, Ebrahim Asadi-Gangraj, Mohammad Mahdi Paydar | JOURNAL OF CLEANER PRODUCTION | 2019 |
| 26 | Designing a mathematical model for dental tourism supply chain | Fatemeh Ahmadi manesh, Mohammad Mahdi Paydar, Ebrahim Asadi-Gangraj | TOURISM MANAGEMENT | 2019 |
| 27 | Lagrangian relaxation approach to minimize makespan for hybrid flow shop scheduling problem with unrelated parallel machines | Ebrahim Asadi-Gangraj | Scientia Iranica | 2018 |
| 28 | Designing a bi-objective multi-echelon robust blood supply chain in a disaster | Mitra Habibi, Mohammad Mahdi Paydar, Ebrahim Asadi-Gangraj | APPLIED MATHEMATICAL MODELLING | 2018 |
| 29 | Goal programming-based post-disaster decision making for allocation and scheduling the rescue units in natural disaster with time-window | Sina Nayeri, Ebrahim Asadi-Gangraj, Saeed Emami | International Journal of Industrial Engineering and Production Research | 2018 |
| 30 | a heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines | Ebrahim Asadi-Gangraj | International Journal of Industrial Engineering and Production Research | 2017 |
| 31 | A Heuristic Approach to Solve Hybrid Flow-Shop Scheduling Problem with Unrelated Parallel Machines | Ebrahim Asadi-Gangraj | International Journal of Industrial Engineering and Production Research | 2017 |